Cyljet

A patented method for optimising your Jet-Grouting operations

Our team provides you with support and advice on Jet-Grouting operations:

  • For quick checking of column dimensions
  • To ensure that only those quantities of material strictly necessary are used
  • To optimise worksite costs and schedules

 

An exclusive solution developed by Sixense

How Cyljet operates

Cyljet enables in-situ dimensional checking of injection columns during construction.

The solution is based on the Electric Cylinder method, and provides 3D investigation around the full circumference of the column.

A multicore cable with evenly spaced electrodes is installed at the centre of the column to record and process the potential differences generated by the induced electric current to produce a 3D image of the injected column.

Cyljet can equally be used to validate a test plot, as well as provide continual checking of injection quality as work progresses.

Reduce costs and save time with Cyljet

  • Significant optimisation of operational costs:
    Cyljet enables injection parameters to be calibrated to the highest-possible level of precision
  • A robust and proven method:
    Removes the need to excavate around columns to check the injection quality
  • A quick solution:
    Short implementation times and rapid availability of results (less than 48 hours after completion of measurements)

The added benefits of using our Cyljet solution

A unique method developed by experts in applied geophysics

The best ratio of on-site adaptability to speed of results

Easy, rapid implementation anywhere in the world via the international Sixense network

More than 4,000 columns measured worldwide

Download the Cyljet solution datasheet

Need to talk with an expert ? Contact us
Cyljet - olivier-fontanarava - Sixense
Olivier Fontanarava
Cyljet expert, answers your questions
Contactez Olivier
Cyljet - olivier-fontanarava - Sixense